Skip to content

Scheduling Integration Runs

Scheduling Integration RunsΒΆ

You can run an integration on demand by clicking Run Once () in the Actions column of the Integrations list view. You can also schedule it to run in advance.

To schedule an integration to run once:

  1. Click Integrations in the left navigation pane. The Integrations view lists existing integrations.
  2. Find the integration you want to run:
    • Search for the integration by its name or description.
    • Filter integrations by partner name, RCX process, template, or status.
  3. Click Scheduling.
  4. Fill in the fields as described:

    Property Name Property Description
    Efective Date/Time Select noon tomorrow
    Repeating Select No.
    Control Rate/Min Select 4000.

To schedule an integration to run on a regular basis:

  1. Click Integrations in the left navigation pane. The Integrations view lists existing integrations.
  2. Find the integration you want to run:
    • Search for the integration by its name or description.
    • Filter integrations by partner name, RCX process, template, or status.
  3. Click Scheduling. The Scheduling Properties view opens.

    The Scheduling Properties section in an integration editor interface. The main panel displays fields for configuring scheduling: Effective Date/Time set to September 19, 2025, 11:30:00; Repeating option set to Yes; Frequency set to Days; Repeat Interval set to 3; and Control Rate/Min set to 4000. A Preview Schedule button is visible.

  4. Fill in the fields as described:

    Property Name Property Description
    Efective Date/Time Select today's date and time
    Repeating Select Yes.
    Frequency Select Hours.
    Repeat Interval Type 4.
    Control Rate/Min Select 4000.

See also: